Trouble of construction machinery
Today, trouble occurred at the time of operation check before the work of packing before shipping of construction machinery uncommon.
Used machinery and body relationship is to work always check before dispatch and land transportation.
But today, it – the engine is not applied
I Approaching push time of pick-up of large shipping company, …
Packing personnel because there are not familiar to the construction machinery
Since I’ve been doing as a hobby also restoration work of old cars relationship
And I think that it is the carburetor float as soon as a look
Remove the carburetor cleaner of Waco
Washed with carburetor cleaner to remove the float.
By the way, is the image of Harley carburetor.
Engine start-up in one shot in the Son!
When you touch the gasoline carburetor cleaner for the first time in a long time
Hands became itchy but OK!
Peace of mind in time to the time of collection ★
Gasoline car, but I put the engine on a regular basis during storage especially in vehicle and machinery normally associated
It was in the guidance is needed since the stock has increased, because it is responsible for the lack of administrator for other businesses busy.
タグ
Construction machinery、Trouble09/04/2013 | コメントは受け付けていません。|
カテゴリー:Work