Completion Harley shovel in the dead of winter

IN ~ I’ll sleep agent did to the limit tonight Oh
Sharing my review of tonight.

sea

Today I finished the rough
Of 1200cc
1977 Harley shovel lowrider expression

“4 months” period
There was a feeling that was almost done except for engine overhaul Nandakanda mission.

In the same amount was also place to buy if you were at the beginning Shiaga~tsu · ·

Yara hobbling later painted in-house.
I – I’ve been doing something outside to # 00: AM0 in the cold with snot dripping tonight

Touch-ride appropriately in our daytime but cold.

タグ


29/11/2012 | コメントは受け付けていません。|

カテゴリー:Work

このページの先頭へ

イメージ画像